Sri Periyava Kainkaryam Goshala – Shed Renovation Update 2

Jaya Jaya Sankara Hara Hara Sankara,

Quick update on our Goshala Renovation work:

The following work has been completed:

1. Low roofing in the center shed has been increased by 6 more feet so the shed has proper ventilation
2. Calf shed work roofing complete – Thatched roof removed and replaced with metal roof
3. The cow shed next to calf shed work has been complete – Thatched roof removed and replaced with
metal roof
4. New cow shed work roofing complete – Previously around 20 cows were standing in open and now they
have a solid roof on top of them
5. Injured cow shed roofing work complete – Thatched roof removed and replaced with metal roof

So far we have spent around Rs. 4 lakhs for the above.

Pending work remaining:

1. Cladding work for all the sheds so rain water does not seep/pour in during monsoon season
2. Increase the ground level by sand filling the injured cow shed – No concrete floor as injured/sick/old
cows are much better off in the sand than concrete.
3. Civil work for the new shed – Concrete flooring to be done
4. Elevate the Gosala low level areas by filling with sand. This ensures water does not get stagnated and we
don’t get into mosquito bite issues for Gho Mathas.

Will keep you all posted on the progress. Latest pictures and video clips below. Thank you very much for all your support.

Sri Periyava Thiruvadi Sharanam,
Rama Rama

Entire video tour of the Gosala showing all the completed shed work including the center shed


Injured/Sick/Old Cow Shed

Calf and Cow Shed – Divided by a small separator in the center

New Cow shed